IT Modernization & Process Reliability: AUSA Medical Devices Pvt Ltd, BengaluruBackground & Challenge
Ctrl E Engagement & Approach
Background & Challenge

- Enterprise-Grade IT Hardware Supply
- Delivered high-performance Lenovo P14s Gen5 Laptops (Core Ultra 7, 32GB RAM, RTX GPU, 1TB SSD) for engineering/design teams—empowering advanced CAD, analytics, and production management.
- Supplied HP Series 5 FHD Monitors and Dell Latitude laptops for supervisory and mobile staff, supporting both office and on-floor requirements.
- Print Fleet Management & Support
- Supported Konica Minolta, Canon, and HP business printers with drums, fuser units, transfer rollers, developer kits, toner cartridges in all colors, and full non-comprehensive AMC.
- Provided Dymo label makers and compatible consumables for warehousing, parts tracking, and compliance documentation.
- Service, Repairs & AV Enablement
- Rapid onsite and remote diagnostics for printer/service calls, minimizing operations downtime.
- Supplied LG UHD TVs, wireless mice, and full-motion ceiling mount brackets for R&D training and engineering review rooms.
- Consumables & Process Optimization
- Streamlined procurement of original and compatible toner cartridges, reducing costs and replenishment cycles for high-volume printing.
- Enabled admin teams with Logitech MK540 wireless keyboard/mouse combos, stand-alone mini wireless mice, and full spares support.
Conclusion
AUSA Medical Devices now operates with an enterprise-grade IT & print environment. Ctrl E’s support minimized risks tied to downtime and procurement bottlenecks, delivering efficient, reliable workflows that empowered industrial growth and manufacturing excellence.
Results And Impact
Design & Manufacturing Uptime Elevated: Robust workstations, displays, and reliable AV infrastructure improved team productivity, collaboration, and output quality.
Print Fleet Reliability Achieved: Proactive AMC and rapid part delivery slashed printer downtime—ensuring compliance and traceability in production cycles.
Process Efficiency Strengthened: Optimized device supply and replacement reduced delays and centralized IT spend, boosting operational efficiency for both production and admin divisions.
Flexible, Scalable Support: Ctrl E’s ongoing engagement enabled seamless scale-up and rapid tech adaptation as business requirements evolved.

